
Roof replacement in Loveland, CO
A roof replacement here means a tear-off down to the wood decking and a new roof built back up in Class 4 impact-resistant shingles, which Loveland, Fort Collins, Berthoud and Larimer County require. We measure the roof, write the estimate line by line, pull the permit and leave the yard swept with a magnet.
- Class 4 shingles where your town requires them
- Permit pulled for you
- Line-by-line written estimate
Tell us about the roof you have now
We usually answer the same day. After a hail storm, we answer until dark.
Water coming through the ceiling right now? Call or text: 970-555-0162
What your town requires on a new roof
Colorado has no statewide building code, so each town writes its own roof rules. This is what each official page says today. We check again before every permit.
| Where the house is | Class 4 shingles | Permit |
|---|---|---|
| Fort Collins | Required on asphalt shingles when half the roof or more is replaced | Any full replacement, and partial work over one square; drip edge, ice barrier at the eaves and ventilation to code; a waste management plan before the permit closes |
| Loveland | Required since June 1, 2022 | City building permit, plus a Loveland Fire Rescue Authority permit at 100 square feet or more |
| Berthoud | Required, tested to UL 2218 | Town permit posted on the house before work; town contractor license; virtual reroof inspections |
| Unincorporated Larimer County | Required on replacements and repairs over 25%, with a Class A fire rating | County permit; replacing 25% or more means the whole roof |
| Windsor | No Class 4 rule on the Town's own pages; ask the building department. We quote Class 4 anyway | Town permit, inspections through SAFEbuilt |
| Wellington | Not required by the Town's re-roof checklist. We quote Class 4 anyway | Permit over one square, town contractor license, final inspection; check HOA rules first |
| Estes Park | Not a Class 4 rule, but a Class A fire-rated roof under the Colorado Wildfire Resiliency Code, adopted by the Town in 2026. We quote Class 4 or metal | Town Building Safety inside town limits, Larimer County outside; replacing 25% or more means the whole covering |
How the new roof goes on, course by course
A course is one row of shingles. This is the order the whole roof goes back together, from the wood up.
Tear off to the decking.
Old shingles and underlayment come off, tarps protect the yard, and soft decking boards are replaced.
Drip edge and ice and water shield.
Metal drip edge at the eaves, then a sticky waterproof membrane along the eaves and valleys where ice and snow sit.
Synthetic underlayment.
A tough sheet over the rest of the deck that keeps water out if a shingle ever fails.
Starter strip, Class 4 shingles, flashing and ridge vent.
Each course nailed to the pattern for high-wind areas, new flashing at walls and chimneys, a vent along the ridge.
Magnet sweep and inspection.
A rolling magnet over the yard and driveway for nails, then the town inspection.
“Wes pulled up the storm report for our street before he even got the ladder out, then chalked every hit and showed us the photos at the kitchen table. He met the adjuster on the roof. The new roof went on in Class 4 shingles and he handled the city's waste plan.”
Why we tear off to the wood every time
The decking is the layer of plywood or boards the whole roof is nailed to. Hail and old leaks soften it, and you cannot see that from above the old shingles. Tearing off lets us replace bad boards before anything goes back on.
It also lets us lay ice and water shield along the eaves. Snow melts on a warm roof, refreezes at the cold edge and backs water up under the shingles. The membrane seals around every nail so that water stays out.
Most roofs in Loveland and Fort Collins are replaced after hail, not age. See how we size a storm first on the hail damage page, and what metal can do instead on the metal roofing page.

What is on your written estimate
No single number with nothing behind it. Each line is something you can check.
Squares of roof
The measured area in squares, 100 square feet each, slope by slope, with the pitch of each one.
Decking allowance
How replaced boards are counted, so a surprise under the old shingles does not become a surprise on the bill.
Materials by name
The shingle line and its Class 4 rating, underlayment, ice and water shield, drip edge, flashing and ridge vent.
Permit, waste and cleanup
The town permit, the Fort Collins waste plan where it applies, the dumpster and the magnet sweep.
Roof replacement questions we hear most
What is a Class 4 shingle?
A shingle that passed the top level of the UL 2218 impact test, where steel balls up to two inches across are dropped onto it from a set height without cracking it. It is not hail-proof, but it holds up to the sizes that ruin ordinary shingles far more often. Several of our towns require it on replacements.
Do I need a permit to replace my roof in Loveland?
Yes. The City of Loveland requires a building permit for a reroof, and a reroof of 100 square feet or more also needs a permit and inspection through Loveland Fire Rescue Authority. Repairs under 100 square feet do not need a permit. We pull both permits and book the inspections.
Can you put new shingles over the old ones?
We do not. A tear-off lets us see and replace soft decking, put down ice and water shield at the eaves and fit new flashing. In Larimer County, replacing a quarter of the roof or more means the whole roof is replaced. A second layer also hides hail damage from the next inspection.
How long does a roof replacement take?
Most homes in our towns are torn off and roofed in one to two working days, weather allowing, plus the inspection. Steep or cut-up roofs take longer. In Fort Collins the city does not offer next-day reroof inspections when it is busy, so we book early.
Will my insurer pay for a replacement after hail?
That is your insurer's decision, based on the damage and your policy. We give you the dated photos and the storm report, meet the adjuster if you want, and build from the insurer's scope. Read your rights on the hail damage page.
Wes measures it, writes it and is there when it goes on
We replace roofs from Loveland across Fort Collins, Windsor, Berthoud, Wellington and Estes Park. Smaller problem? See roof repair.

Wes Halvorsen, owner and roofer
Wes answers the phone, gets on the roof and writes the estimate. You deal with him from the first inspection to the last magnet sweep of your yard.
Book a replacement estimate
We usually answer the same day. After a hail storm, we answer until dark.
Water coming through the ceiling right now? Call or text: 970-555-0162

Ready for a new roof? Start with a measurement.
Tell us the address and roughly how old the roof is. If a storm started this, give us the date too.
Book a free storm inspection
We usually answer the same day. After a hail storm, we answer until dark.
Water coming through the ceiling right now? Call or text: 970-555-0162